Building the design as it was drawn
Full implementation ensuring quality, precision and alignment with the original design intent — from ground preparation through to final planting. A drawing is a set of promises. Construction is where they are either kept or quietly abandoned.
Landscape construction is the physical delivery of a designed landscape: earthworks and levels, drainage, services, retaining structures, paving and stonework, walls, steps, water features, lighting, irrigation, soil preparation and planting, through to handover and the establishment period that follows.
We build our own designs, and we build other people’s.
More landscapes fail below the surface than above it. Compacted subgrade, poor drainage, thin or imported soil of unknown quality, construction rubble left buried under a lawn — these are the causes of the problems that appear two years later and cannot be fixed without lifting the finished work.
We decompact, we drain, we check what the soil actually is, and we amend it on evidence rather than habit. It is the least photogenic money on any project and among the best spent.
Every project is set out from a stated datum and a stated line, checked before anything is fixed. Falls are built, not hoped for. Joints are set out so that the cuts land where they should. On a terrace, the difference between competent and excellent is almost entirely in the setting out.
Irrigation sleeves, lighting conduit, water feature ducting, power and drainage are installed and recorded before finished surfaces are laid. Chasing a forgotten conduit through completed paving is the most avoidable cost in this industry.
Our own supervision runs the site. Where specialist trades are required — engineered structures, electrical connection, pool work — we appoint and coordinate them, and we hold their documentation. The client has one number to call.
Existing trees are fenced at the root zone, not at the trunk. Existing buildings, finished surfaces and neighbouring property are protected before work starts. Access routes are agreed rather than assumed.
Construction follows an approved design and an agreed cost. It usually overlaps with the main building contract, and that overlap has to be managed rather than discovered. Landscape work needs the builder’s spoil removed, its levels confirmed and its access route released; the builder needs to know when a terrace is no longer available for scaffolding.
We would rather agree that sequence at the outset with the main contractor in the room.
Yes. We review it first, at our cost, and tell you honestly what we think will not work — usually levels, drainage or an irrigation assumption. We would rather raise it before we price it than discover it in a trench.
Against a measured schedule of works, item by item, so you can see what each element costs and make informed decisions about scope. Lump sums hide too much, and a hidden number is a number that becomes an argument later.
Variations are priced and approved in writing before they are built. Clients change their minds, sites reveal surprises, and both are normal. What is not normal is finding out about the cost at the end.
We carry the risk for our own work and for damage caused by our operations, covered by public liability insurance, and our people are covered under the statutory compensation arrangements. That documentation goes to you before we start. The one thing we ask in return is an agreed access route, so that the boundary of responsibility is clear on both sides.
Workmanship and plant establishment are covered for a defined period written into the contract. Plant establishment guarantees are conditional on the irrigation being run and the maintenance being carried out as specified — which is one of several reasons we prefer to maintain what we build, at least through establishment.