×
HomeAboutServices ProjectsAcademyJournalContact

E3 · Design, CAD and AI

Specifying Soft Landscaping

FormatLive webinar
ForArchitects, QSs
AvailabilityAvailable now
Choose a date and book ↓
Specifying Soft Landscaping

Look inside

Specifying Soft Landscaping: a page from the Handout (page 5)Specifying Soft LandscapingSpecifying Soft LandscapingSpecifying Soft LandscapingSpecifying Soft LandscapingHandout Rev 1: page 1 of 8Handout Rev 1: page 3 of 8 (preview)Handout Rev 1: page 7 of 8 (preview)

4 preview pages and 4 photos. Tap any picture to see it larger. Previews show the top of each page.

How to specify topsoil, compost, planting and establishment so the contractor prices and builds it properly.

A live two-hour webinar for architects, quantity surveyors and landscape architects on specifying soft landscaping so that the contractor prices and builds what you meant. We work through how the Standard Specification and its Project Specification fit together; soil analysis, soil preparation, topsoil and compost; a plant schedule a nursery can quote, the nursery-stock standard, densities, tree pits and the hold points; who waters, what a plant failure is and how replacements work; and how a contractor measures, prices and checks it. One short exercise — find the gaps — a ten-question CPD assessment, and a handout to keep.

When and where

Two hours, 10:00 to 12:00. Live online on Zoom or Microsoft Teams. The joining link is emailed the day before. Up to 60 people.

On the day

10:00–10:10Welcome and housekeeping
Attendance check, how the webinar runs, the CPD assessment at the end, the outcomes
10:10–10:25Part 1 · How the documents fit
The Standard Specification and the Project Specification, Schedules A–G, the order of precedence, the specifier’s checklist
10:25–10:50Part 2 · Soil
Soil analysis before tender, standard soil preparation, topsoil and its re-use, compost, the auditable check
10:50–11:15Part 3 · Plants and planting
A plant schedule a nursery can quote, the nursery-stock standard, densities, tree pits, the 48-hour rule, hold points
11:15–11:35Part 4 · Establishment, measurement and price
Who waters, plant failure and replacement, measurement per plant, how a contractor prices and checks
11:35–11:45Exercise · Find the gaps
Six lines of a specification that will become variations — in the chat
11:45–11:57CPD assessment
Ten multiple-choice questions, twelve minutes, open handout
11:57–12:00Close
Questions, feedback and what comes next

What you will be able to do

  • Explain how the Standard Specification, the Project Specification and its Schedules A–G fit together, and the order of precedence.
  • Specify soil analysis, soil preparation, topsoil and compost so that the soil lines are priced on evidence, not guessed.
  • Write a plant schedule a nursery can quote line by line, with grades, sizes, quantities and densities a contractor can count.
  • Specify tree pits, the 48-hour rule and the hold points that protect the planting.
  • Settle who waters, what counts as a plant failure and how replacements work — before tender.
  • Check the bill’s units and measurement so the contractor prices what you specified, and find the gaps that become variations.

What you need

  • A laptop or desktop with a stable connection, sound and a microphone (camera optional)
  • Your full name, as you want it on the certificate, as your meeting display name
  • The handout (PDF, sent with the link) and a calculator
  • Your professional registration number, if you will claim CPD

Bring

  • A calculator
  • A current soft landscaping specification or bill of your own, if you would like to test it against the checklist

We provide

  • The Handout (PDF, 8 pages): the clauses that matter, a specification checklist and the gaps that cause variations and disputes
  • The CPD assessment and a certificate of completion with the contact hours

Certificate

Everyone who attends gets a certificate of attendance with the contact hours. CPD validation is to be applied for: until it is granted, points depend on your voluntary association.

Questions

Is this CPD-validated?
CPD validation is to be applied for. Until it is granted, the certificate records your attendance, the contact hours and your assessment result.
Do I need the specification?
No. The handout carries the clauses that matter. The Standard Specification and its Project Specification fill-in are sold separately as Word documents.
Is there a break?
No: it is a two-hour webinar with a short stretch at 11:15. The full two hours count as contact time.
What if my connection drops?
Rejoin with the same link. The producer records the time you were away; a long absence reduces the contact time on your certificate.
Is it recorded?
Only if everyone has been told at the start; a recording does not count for CPD.

Can't come? Up to 14 days before: a full refund. 7 to 13 days: move to another date, or half back. Less than 7 days: send someone else in your place. See the terms.

Who it is for

For architects, quantity surveyors and landscape architects who write, price or administer soft landscaping in tender and contract documents. No horticultural knowledge is assumed; you should be used to reading a specification and a bill of quantities.

Licence

One seat for one person on the date you choose. Add or change the names on your booking page any time before the day.

Sold by Origin Design Workshop (Pty) Ltd as part of Origin Contours Academy. Terms, licences and refunds.