A full day on paving, steps, edging and small walls: base preparation, levels, joints and finishing.
A full, hands-on day in the training yard at our showroom garden. In teams of five you build a paving panel from the subgrade up: you set it out square off a fixed line, take the levels from a datum and the DPC, lay and plate-compact a G5 base to a 1:60 fall, set a soldier-course edge in concrete after the levels hold point, screed the sand and lay, cut and joint the pavers. Beside it you build a two-riser step and fill a gabion basket. You finish by inspecting the other team’s work against our tolerances, a short written check (oral answers accepted) and a certificate.
Full day, 07:30 to 15:30. Our showroom garden at Klapmuts, on the R44: De Wilger Farm, c/o N1 & R44, Klapmuts. Map. Up to 10 people.
| 07:30–07:50 | Arrival and PPE Sign-in and consent; PPE issued and fitted; boots checked |
| 07:50–08:15 | Safety briefing The day; the plate compactor and the wet saw; silica dust, cement and lime; lifting; sun; the stop rules |
| 08:15–08:45 | Session 1 · Build-ups, levels and falls The drawing of the bay; the paving sandwich; the DPC rule; falls with a straight edge and a packer; the instrument and staff |
| 08:45–10:00 | Session 2 · Set out, strings and boards Square the panel off the fixed line; the diagonals; corner levels; strings at finished level; timber edging and the step’s first boards |
| 10:00–10:15 | Tea Hands washed; water refilled; sunscreen again |
| 10:15–11:15 | Session 3 · The base G5 in layers, damp, plate-compacted to the falls; the step’s first lift; the gabion bed |
| 11:15–12:00 | Session 4 · Edges and concrete The levels hold point; concrete mixed on a board; the soldier course set and haunched; the step’s second boards; the gabion basket |
| 12:00–12:45 | Lunch In the shade; hands washed first |
| 12:45–14:00 | Session 5 · Bed, lay and cut Screed the sand; lay from the fixed edge; joints and rows; cuts at the wet-cut station; the step treads; the gabion filled |
| 14:00–14:15 | Tea Water and shade |
| 14:15–14:45 | Session 6 · Joint, compact, check Joint sand and the plate; each team inspects the other team’s bay against our tolerances |
| 14:45–15:05 | Written check Fifteen questions; oral answers accepted |
| 15:05–15:30 | Wrap-up Results, certificates and feedback; the bays left safe. We close at 15:30 |
Everyone who completes the course gets a certificate of completion. Those who pass the practical checklist and the short check get one that says assessed competent. Our certificates are not accredited qualifications.
Can't come? Up to 14 days before: a full refund. 7 to 13 days: move to another date, or half back. Less than 7 days: send someone else in your place. See the terms.
For site crews on landscape build jobs, new and experienced. No experience is needed. The day is physical: lifting within 25 kg, kneeling, digging and working outdoors from 07:30 to 15:30. If reading is hard for you, the facilitator reads the key text aloud and the written check can be answered aloud. If you have been trained on a cut-off saw at work, ask your employer to tell us; only trained participants make cuts.